A machine can be installed and still fail real production.
Supplier demos do not prove production readiness. Acceptance must test real files, materials, speed, color, adhesion, curing, RIP and operator handover.
- Final payment or sign-off is near
- The supplier says installation is complete
- Operators already see unstable results
- Acceptance criteria were not defined before purchase