Printing equipment acceptance risk before final sign-off.
Acceptance risk appears when installation status is treated as production readiness. The owner needs measurable evidence before final payment or handover.
A machine can be installed and still fail real production.
Supplier demos do not prove production readiness. Acceptance must test real files, materials, speed, color, adhesion, curing, RIP and operator handover.
Final payment or sign-off is near
The supplier says installation is complete
Operators already see unstable results
Acceptance criteria were not defined before purchase
ChecklistWhat to check
01Supplier claims02Test files03Real materials04Speed and repeatability05Color and adhesion06RIP/profile setup07Final sign-off evidence