Acceptance needs evidence, not a generic handover phrase.
A machine can be installed and still fail real production. The checklist helps owners ask for files, materials, speed, color, adhesion, curing and RIP evidence before signing.
- Before final payment
- Before operational handover
- When acceptance criteria were not defined before purchase
- When operators already see unstable results